Difference between revisions of "Hardware:Status"

From CAC Wiki
Jump to: navigation, search
Line 9: Line 9:
 
| '''Details/reason'''
 
| '''Details/reason'''
 
| '''Resolution'''
 
| '''Resolution'''
 +
|-
 +
| 22/01/22 - 8-4:30
 +
| Frontenac Cluster
 +
| Onsite Power work
 +
| Electrical work will require Frontenac Cluster to run off of generator. No disruptions are expected.
 +
|-
 
|-
 
|-
 
| 07/09/2019 - 9.30 am
 
| 07/09/2019 - 9.30 am

Revision as of 13:25, 20 January 2022

This page shows information about the status of systems at the Centre for Advanced Computing. It will be updated with additional information as new events arise.

System Status Messages
Date Affected systems Details/reason Resolution
22/01/22 - 8-4:30 Frontenac Cluster Onsite Power work Electrical work will require Frontenac Cluster to run off of generator. No disruptions are expected.
07/09/2019 - 9.30 am caclogin03 caclogin03 down login node requires reboot after becoming non-responsive . Re-booted and updated this host
07/02/2019 - 9.40 am caclogin04 caclogin04 unresposive login node requires reboot after becoming un-responsive . Reboot fixed the issue and updated this host
05/17/2019 - 11 am caclogin03 caclogin03 down login node requires reboot after becoming non-rseponsive , reboot resolved the issue
02/27/2019 - 10 am caclogin02 caclogin02 VM down login traffic directed to caclogin03/4, rebooted resolved issue
12/10/2018 - 8 am caclogin02 caclogin02 VM down login traffic directed to caclogin03/4
12/04/2018 - 8 pm caclogin03/04 issues with login nodes; caclogin02 works resolved after reboot
10/29/2018 - 4 pm caclogin03 / file system full resolved
08/06/2018 - 08/10/2018 Cluster downtime Scheduled filesystem upgrade planned downtime
07/12/2018 - 10:30 AM GPFS outage Filesystem temporarily unavailable resolved
06/27/2018 - 9:00 AM Login node shutdown Maintenance (unscheduled) node back in service
06/20/2018 - 8:00 AM Login node non-responsive Cause : out of memory resolved, login restored (take-down, reboot)
05/01/2018 - 9:00 AM Scheduler maintenance Scheduled upgrade/downtime of scheduler resolved
04/23/2018 - 7:00 AM Frontenac login node login issues, reboot functional after reboot
04/19/2018 - 3:30 PM Frontenac login node lost access to file system, reboot resolved after reboot
03/16/2018 - 11:00 AM Scheduler upgrade Scheduled upgrade/downtime of scheduler Upgrade complete, working on x11 support
01/28/2018 - 5:00 AM Frontenac login node caclogin02 Node went down out of schedule login restored, investigating causes
01/18/2018 - 11:30 AM Frontenac login node caclogin01 Out-of-schedule shutdown / reboot (~45min) updates / maintenance
11/21/2017 - 11:00 PM Frontenac (all nodes) Temporary unmount of /global file system re-mounted, file system accessible
10/30/2017 - 8:00 AM multiple production nodes unreachable scheduler lost contact to production nodes nodes will be transfered to Frontenac
10/30/2017 - 8:00 AM swlogin1 (login node) No login possible login restored
10/03/2017 - 8:00 AM head-6b disk array at near capacity working on reducing usage
10/02/2017 - 8:00 AM head-6b disk array full partly resolved (freed 4 TB)
7/13/2017 - 10:00 AM swlogin1 unreachable through ssh resolved
7/13/2017 - 8:00 AM caclogin01 temporary maintenance shutdown back up